Deck concrete support columns install and level

Before support columns install

Opening up the affected deck area

1 foot wide by 4 feet deep holes for the support columns

cementing our posts into place

placing rafters in place 

Jacking up entire deck so it can be level

Once the deck is jacked up to the necessary level we bolted the rafters into the support columns 

The stairs got left behind

so we jacked and leveled them

Deck is Complete